Monday, January 28, 2013

Traver Creek Project Update #8


The excavation of Traver Creek through the golf course as well as the excavation of the arrowood drain are complete. These areas have been seeded with a native plant mixture and covered with straw mulch blankets. The crossings have been fabricated and are usable. Rough grading of most of the spoil pils on the golf course is complete. There are three major piles that still need rough grading, the berm along Traver Road, the hill between #18 tee and #10 fairway as well as the hill to the west of #14 tee.

All of the spoil piles need final grading as well as seeding of the turfgrass varieties. Sod will be laid along #11 fairway, #10 tee and fairway as well as any area where haul roads crossed fairways. Some of these areas include #14, #16, #13 and possibly #18.

Golf Course staff are looking at finalizing plans for tree replacement. There are over 100 trees that are budgeted to be planted after the ground thaws.

One other major assignment will be the repair and replacement of damaged irrigation pipe and heads that either needed to be moved or were damaged during construction.

Most of this work cannot be acomplished during sub-freezing weather, so the construction crew will be taking some time off and will be back in a couple of weeks.

Here are some photos of Traver Creek about to crest above the "low flow channel" and into the "high flow channel." This allows the water to signifcantly slow down and deposit sediment that it has picked up before finally making it to the Huron River.

Near #12 green.

From #13 tee. #10 tee is the large mound of soil to the right of the creek.

Looking from the bridge near #13 tee toward the practice green.

The convergance of the new arrowood drain and Traver Creek.



Tuesday, January 8, 2013

Traver Creek Project Update #7


After taking some time off at the end of the year, progress has been steady on the Traver Creek project. Unfortunately, snow has fallen and pictures do not come out well in snowy conditions.

Here are some.

On the bridge between #12 green and #13 tee, looking toward #11 green.

Same bridge, looking toward the practice green.

#13 tee.

New crossing over the Arrowood drain, looking toward #11 fairway.

Same crossing, looking back toward #11 tee.

Wetland between #11 green and #12 green after seeding. Taken from the bridge near #12 tee.

Same view,  looking toward #13 tee.


This video was taken from #13 tee. It shows three excavators working on the creek and wetland.

Monday, January 7, 2013

December and 2012 Yearly Weather Summary

December 2012 had a high temperature of 61.5 degrees on the 4th. The lowest temperature recorded was 8.5 degrees(Dec 28th.) The average temperature was 35.5. December had 5 days which did not get above freezing. There were 19 days where the low temperature for the day was below 32 degrees.

There was 2.16 inches of rain during the moth. The highest daily rainfall was 1.00 inches (Dec 20th.) Twelve days had more than a trace of rain, while 5 days had at least a tenth of an inch.

The highest windspeed recorded was 37.0 mph (Dec 21st.) The average windspeed was 3.6 mph.

For the entire year of 2012, Leslie Park received 21.35 inches of rain. The maximum daily rain for the year was 1.18 inches on August 10th. For comparison, 2011 had nearly 42 inches of rain with 3 rain events of over 2 inches.

The highest temperature for 2012 was 100.6 on July 6th.  The lowest temperature recorded was 0.6 degrees on January 6th.

The highest sustained windspeed recorded was 37 mph on three separate occasions: March 3rd, April 16th and December 21st.

Tuesday, December 18, 2012

Traver Creek Project Update #6



The North Pond has basically been finished. The slopes have been seeded and covered with a straw mulch. The wall is done and the pond is up to the normal level.


The South Pond underpass is done. Here you can see the forms around the headwall.

The pumper truck fills in the concrete forms.


The guy on the right in this photo has a chest mounted remote control that moves the pump chute.



Video of the pumper truck in action.

After the forms were removed.

The Arrowood Drain has been started. This will run between #11 tee and #13 tee and returns this to a more historically accurate path for the water.

This is the view from in front of #13 tee.









Tuesday, December 4, 2012

Traver Creek Project Update #5


Things have been going pretty well with the Traver Creek Project. The three retaining walls were finished on Friday, November 30th.
Almost done with the north pond (#17) wall.

The wall from the north side.

The wall and rip-rap along the Traver Creek discharge from the pond.

Working on wall 2 by #10 green.

The finished product.

Seeding with native plants along the creek and installing mulch blankets.

Looking down from #17 green toward #10 green.

Starting the final wall near #12 green.

Diversion on the south pond (#12)

The view from 12 tee.

Dredging of the south pond begins.











Monday, December 3, 2012

November 2012 Weather Summary

The high temperature at Leslie Park Golf Course for the month of November was 67.6 degrees on the 11th. The lowest temperature recorded was 20.6 (14th.) The average temperature was 39.0 degrees. The low fell below freezing on 19 of the 30 days.

We received 0.83 inches of rain at the weather station. 0.57 inches of that rain fell on Nov 12th. ONly 4 days had more than a trace of rain and only 2 days had more than a tenth of an inch. The other day aside from the 12th over a tenth of an inch was the 23rd, where we got 0.12 inches. The total for the year stands at 19.19 inches.

The highest windspeed recorded was 30 mph on the 11th. Average for the moth was 2.8 mph.

Wednesday, November 21, 2012

Traver Creek Project Update


Progress is being made on the creek. The north pond is almost complete, once the retaining wall is set, the diversion of Traver Creek will be removed and it will begin to fill back up with water.

Starting the second course along #17 green.

The blocks are stored in the maintenance barn parking lot until needed.



The view from #17 forward tee.


The creek running beside #17 green is ready for seed. This picture was taken from the bridge to #18.



The cross vein in front of #10 green has been installed.

This is the plunge pool just after the bridge. You can see the bypass pump here.


The creek banks have been sloped and are waiting for topsoil and seeding. You can see the 4 inch hose running from the pump which bypasses the area that is being worked on in the foreground.

Excavators work in tandem on both sides of the creek.

The carpenters have started construction on the crossings over the wetlands. This is coming off of #13 tee. The Arrowood drain that currently crosses 13 fairway 100 yards from the green will be re-routed under here. According to aerial photos from the 1950's, this is closer to where it ran historically.

Finally, here is an overview of the work taken from behind #3 green. It is hard to make out, but I think there are around 15 machines working on various projects in this scene.