Things have been going pretty well with the Traver Creek Project. The three retaining walls were finished on Friday, November 30th.
Almost done with the north pond (#17) wall.
The wall from the north side.
The wall and rip-rap along the Traver Creek discharge from the pond.
Working on wall 2 by #10 green.
The finished product.
Seeding with native plants along the creek and installing mulch blankets.
Looking down from #17 green toward #10 green.
Starting the final wall near #12 green.
Diversion on the south pond (#12)
The view from 12 tee.
Dredging of the south pond begins.